CN

SmartSupply AI

Centrica PLC — Demo Access

Sign in to continue

Need access? Email kemphil@amazon.co.uk

Access restricted to amazon.co.uk, amazon.com, and mckinsey.com email addresses.

Field Operations

Jobs Completed

1,422/2,484

+8% vs yesterday

Schedule Adherence

87%

614 engineers behind

Safety Compliance

100%

0 gates skipped today

First-Time Fix

91%

+3% this week

Revenue (Upsell)

£48,220

231 leads captured today

AI Engagement

94%

4,832/5,000 engineers active

Traffic Incidents — 3 Active (M1 J28-30, A329 Reading, M6 J15-16)

11 engineers affected across 3 incidents. 6 departed early (AI-prompted), 5 notified customers, 2 require rescheduling.

12 min ago

Escalation Feed

2 active

Reading Anomaly — J. Baker (Job 3)

CO reading of 142 ppm logged (threshold: 100 ppm). Engineer notified to re-test and ventilate. Awaiting follow-up reading.

8 min ago

Schedule At Risk — P. Williams

Running 35 min behind after extended PCB replacement. Final job (Hive install) may breach 17:00 window. Customer notification recommended.

22 min ago

Resolved — Parts Shortage (M. Thompson)

WB-IGN-3042 unavailable at branch. AI rerouted engineer to secondary depot. 12 min delay absorbed.

1h ago

Schedule Adherence

Ahead of schedule 1,401 engineers
On schedule 2,817 engineers
Behind schedule 614 engineers

187 jobs at risk of breaching appointment window

AI Agent Performance

Engagement rate 94%
Recommendation acceptance 78%
Time saved per job 14 min avg
Safety interventions 714 today
Report quality uplift +22%
Parts prediction accuracy 96%

Commercial Performance

Today's upsell activity

671

Opportunities Presented

231

Interested

181

Maybe

259

Not Now

HomeCare Cover

£23,460

120 leads · 34% conversion

Hive Smart Heating

£16,840

71 leads · 28% conversion

Heat Pump Assessment

£7,920

40 leads · 22% conversion

Parts Availability — Tomorrow

714 pending

18,642

Confirmed Available

714

Pending Delivery

23

At Risk (overdue)

VL-PCB-8735 — Vaillant ecoTEC Pro PCB

For T. Hughes (Job 2, Aisling Murphy) · Expected yesterday

OVERDUE

HIV-AH2-KIT — Hive Active Heating Kit

For M. Khan (Job 4, Property install) · Expected yesterday

OVERDUE

WB-IGN-3042 — Ignition Electrode (×3)

For depot stock replenishment · ETA 07:30 tomorrow

IN TRANSIT

LG-E470-G — residentialTS2 Gas Meter (×4)

For depot stock · ETA 09:00 tomorrow

IN TRANSIT

23 overdue parts affecting 19 jobs may require rescheduling if not received by 07:00. AI has identified backup suppliers with same-day delivery for 21 of 23.

Performance Leaderboard

3-month rolling · May–Jul 2026

Composite score: first-time-fix rate (40%), report quality (30%), additional observations (10%), upsell conversion (10%), schedule adherence (10%).

Top Performers

Sustained excellence over 90 days
1
D. Reynolds Reading depot · Lv 12
96.4

+2.1 ↑

2
S. Okoro Reading depot · Lv 11
94.8

+1.4 ↑

3
M. Kowalski Bristol depot · Lv 13
93.2

+0.3 →

4
T. Hughes Reading depot · Lv 10
92.7

+1.8 ↑

5
J. Okonkwo Oxford depot · Lv 14
91.9

-0.6 ↓

Rising Stars

Fastest improvement over 90 days
K. Osei Birmingham · Lv 4 · Joined Jan '26
+18.6

58 → 77

P. Sharma Manchester · Lv 5 · Joined Nov '25
+15.2

64 → 79

A. Nowak Leeds · Lv 6 · Joined Sep '25
+14.7

68 → 83

R. Ahmed Reading · Lv 3 · Joined Mar '26
+12.9

52 → 65

C. Williams Bristol · Lv 7 · Joined Jul '24
+11.4

74 → 85

74.2

Fleet avg score

+3.1 vs 3 months ago

812

Engineers improving

16% of fleet

3,946

Stable (±2 pts)

79% of fleet

242

Declining

5% — coaching triggered

Gate Completion Integrity

3 anomalies

AI monitors completion patterns across 5,000 engineers for suspicious behaviour — identical readings, impossibly fast completions, or statistically improbable sequences.

Gates completed today 2,313
Avg time on gate step 2m 14s
Fast completions (<30s) 0
Identical reading sequences 0

Pattern flagged — R. Martinez

CO readings of exactly 0.0 ppm on 14 consecutive jobs (probability <0.1% given job mix). Last calibration check: 6 days ago. Recommend: flue gas analyser verification at next depot visit.

All clear — 4,828 other engineers

Completion times, reading distributions, and step sequences within normal parameters. No gaming patterns detected.

Vulnerability Compliance

PSR active

Cross-references every job against the Priority Services Register and internal vulnerability flags. Verifies protocols were followed.

PSR customers visited today 1,847
Additional protocols followed 1,847/1,847
Safeguarding referrals today 14
Welfare concerns noted 23

Safeguarding referral submitted

D. Reynolds flagged welfare concern at 42 Elm Grove — elderly customer living alone, property in poor condition, possible self-neglect indicators. Referral sent to local authority adult services.

Follow-up required — unresolved from prior visit

Property at 8 Caversham Rd was flagged as "possible hoarding concern" by M. Khan on 22 Jan 2026. No follow-up referral logged in 6 months. Today's visiting engineer (S. Okoro) has been alerted to reassess and submit referral if confirmed.

Tomorrow's PSR visits scheduled 221 customers

Engineers pre-briefed with specific needs (language, mobility, oxygen equipment, dementia protocol).

Quality & Reporting

Avg report quality 72/100
Reports below threshold 4
Photo documentation rate 88%
Deviations flagged 6